A. Preliminary PUD. In addition to the applicable requirements of GHMC 19.02.002, a complete application for preliminary PUD approval shall consist of the following information:

1. An environmental checklist or impact statement, as may be applicable, pursuant to GHMC Title 18;

2. The title and location of the proposed development, together with the names, addresses and telephone numbers of the recorded owners of the land and the applicant, and if applicable, the name, address and telephone number of any architect, planner, designer or engineer responsible for the preparation of the plan, and of any authorized representative of the applicant;

3. A written description addressing the scope of the project, gross acreage, the nature and size in gross floor area of each use and the total amount of land in square feet to be covered by impermeable surfaces;

4. A vicinity map showing site boundaries and existing roads and accesses within and bounding the site, as well as adjacent parcels and uses;

5. A topographic map delineating contours, existing and proposed, at two-foot intervals and which locates and classifies existing streams, wetlands, steep slopes and other natural features and/or critical areas;

6. Plans drawn to a scale no smaller than one inch equals 30 feet showing the proposed general location and size of proposed uses, buildings, buffer areas, yards, open spaces and landscaped areas;

7. A circulation plan drawn to a scale acceptable to the public works director illustrating all access points for the site and the proposed size and location of driveways, streets and roads that have immediate impact on public rights-of-way;

8. Utility, drainage and stormwater runoff plans;

9. A plan of all proposed landscaping including buffers and screening to be used as well as identification of areas of significant trees proposed to be retained;

10. A statement explaining how the proposed plan is consistent with and implements the city of Gig Harbor comprehensive plan, the designation under the comprehensive plan, current zone classification, and desired zone classification;

11. A narrative describing how the proposal provides substantial additional benefit to the citizens of the city of Gig Harbor (the benefit accruing as a result of implementation of the PUD process as opposed to following the development standards of the underlying zone), and how it is proposed the additional amenities and benefits should apply to the percentage of additional density or gross floor area, or additional height being requested;

12. A complete application for design review as required by GHMC 17.98.040; and

13. A map of the area, with the area proposed for any rezone outlined in red.

B. Final PUD. In addition to the applicable requirements of GHMC 19.02.002, a complete application for final PUD approval shall consist of the following information:

1. A copy of the approved preliminary PUD plans, if required by the director; and

2. Final PUD plans drawn to a scale no smaller than one inch equals 30 feet showing the items required by GHMC 17.90.040(A)(5) through (9); and

3. A written statement on how the final PUD complies with the approved preliminary PUD and any conditions of preliminary PUD approval; and

4. A legal description and map of the area subject to the final PUD. (Ord. 1347 § 57, 2016; Ord. 1245 § 26, 2012; Ord. 1197 § 53, 2010; Ord. 951 § 6, 2004; Ord. 866 § 4, 2001; Ord. 710 § 90, 1996; Ord. 573 § 2, 1990).