All portions of a site must either be landscaped at the time of first-phase development, or in accordance with one of the following options:

A. Perimeter area landscaping as required under GHMC 17.78.070 is installed around the entire first-phase portion of the site, as though the first-phase portion constituted the entire site. In this situation, phasing lines shall be considered property lines for purposes of determining required landscaping; or

B. The second-phase portion of a site is completed within three years of completion of the first phase as per an approved site plan, or as per a nondevelopment landscape plan. The nondevelopment landscape plan shall be submitted to and approved by the city prior to issuance of any certificates of occupancy on the site. The nondevelopment landscape plan will be required in addition to a second-phase site plan, and shall include a performance assurance device as specified under GHMC 17.78.110. (Ord. 1086 § 11, 2007).