Skip to main content
Loading…
This section is included in your selections.

In addition to the criteria for approval applicable to an individual application, all subdivisions must meet the following general requirements in order to be approved:

A. Zoning. No subdivision may be approved unless written findings of fact are made that the proposed subdivision or proposed short subdivision is in conformity with any applicable zoning ordinance, comprehensive plan or other existing land use controls.

B. Dedications, Generally.

1. An offer of dedication may include a waiver of right of direct access to any street from any property, and if the dedication is accepted, any such waiver is effective. The city may require such waiver as a condition of approval.

2. Roads not dedicated to the public must be clearly marked on the face of the plat.

3. Any dedication, donation or grant as shown on the face of the plat shall be considered to all intents and purposes as a quitclaim deed to the said donee(s) grantee(s) for his/her/their use for the purpose intended by the donor(s) or grantor(s).

4. If the plat or short plat is subject to a dedication, the certificate or a separate written instrument shall contain the dedication of all streets and other areas to the public, and individual(s), religious society(ies) or to any corporation, public or private, as shown on the plat or short plat, and a waiver of all claims for damages against any governmental authority which may be occasioned to the adjacent land by the established construction, drainage and maintenance of said road. Said certificate or instrument of dedication shall be signed and acknowledged before a notary public by all parties having any ownership interest in the lands subdivided and recorded as part of the final plat.

5. Every plat and short plat containing a dedication filed for record must be accompanied by a title report confirming that the title of the lands as described and shown on said plat is in the name of the owners signing the certificate or instrument of dedication.

6. Dedication of land to any public body, provision of public improvements to serve the subdivision, and/or impact fees imposed under RCW 82.02.050 through 82.02.090 may be required as a condition of subdivision approval. No dedication, provision of public improvements or impact fees imposed under RCW 82.02.050 through 82.02.090 shall be allowed that constitutes an unconstitutional taking of private property.

C. Dedication of Public Park. If the preliminary plat includes a dedication of a public park with an area of less than two acres and the donor has designated that the park be named in honor of a deceased individual of good character, the city council shall adopt the designated name.

D. Release from Damages. The hearing examiner shall not as a condition to the approval of any subdivision require a release from damages to be procured from other property owners.

E. Flood, Inundation or Swamp Conditions. A proposed subdivision may be disapproved because of flood, inundation, or swamp conditions. Construction of protective improvements may be required as a condition of approval, and such improvements shall be noted on the final plat. No plat shall be approved covering any land situated in a flood control zone as provided in Chapter 86.16 RCW without the prior written approval of the State Department of Ecology.

F. Bonds. In lieu of the completion of the actual construction of any required improvements prior to the approval of a short or final plat, the director or city council may accept a bond, approved as to form by the city attorney, in an amount and with surety and conditions satisfactory to it, or other secure method, providing for and securing to the city the actual construction and installation of such improvements within a period specified by the city and expressed in the bonds. In addition, the city may require the posting of a bond securing to the city the successful operation of improvements for up to two years after final approval. All bonded improvements shall be designed and certified by or under the supervision of a registered civil engineer prior to the acceptance of such improvements. (Ord. 701 § 2, 1996).