Skip to main content
Loading…
This section is included in your selections.

Section 105.1 of the IFC is amended to read as follows:

105.1 General. Permits shall be in accordance with Section 105.

105.1.1 Permits required. Permits required by this code shall be obtained from the fire code official. Permit fees shall be paid prior to issuance of a fire code operational or construction permit prescribed under IFC Section 105 as required in accordance with the City’s permit fee resolution. Issued permits shall be kept on the premises designated therein at all times and shall be readily available for inspection by the fire code official.

105.1.2 Types of permits. There shall be two types of permits as follows:

1. Operational permit. An operational permit allows the applicant to conduct an operation or a business for which a permit is required by Section 105.6 for either:

1.1 a prescribed period;

1.2 until renewed or revoked.

2. Construction permit. A construction permit allows the applicant to install or modify systems and equipment for which a permit is required by Section 105.7.

105.1.3 Permits for the same location. When more than one permit is required for the same location, the fire code official is authorized to consolidate such permits into a single permit provided that each provision is listed in the permit.

(Ord. 983 § 16, 2005).