Skip to main content
Loading…
This section is included in your selections.

The city may accept for maintenance those new residential stormwater facilities constructed under an approved permit that meet the following conditions:

A. Improvements in residential plats/PRDs have been completed on at least 80 percent of the lots, unless waived by the director; and

B. All drainage facilities have been inspected and accepted by the director and said drainage facilities have been in satisfactory operation for at least two years; and

C. All drainage facilities reconstructed during the maintenance period have been accepted by the director; and

D. The stormwater facility, as designed and constructed, conforms to the provisions of this code; and

E. All easements and tracts required under this code, entitling the city to properly operate and maintain the subject drainage facility, have been conveyed to the city and have been recorded with the Pierce County auditor; and

F. For nonstandard drainage facilities, an operation and maintenance manual, including a maintenance schedule, has been submitted to and accepted by the city; and

G. A complete and accurate set of reproducible mylar record drawings and a digital file in a drafting format acceptable by the director have been provided to the city of the stormwater facilities. (Ord. 1169 § 2, 2009).